Project Summary
The 10th of Ramadan Project involved the supply, installation, testing, and commissioning of a complete firefighting and fire alarm system, executed to meet the highest safety and reliability standards. Our team successfully delivered an integrated solution covering all industrial and administrative areas within the facility.
Key Items used in this project
- FM200 suppression system
- Fire alarm system (Apollo)
- Firefighting equipment and accessories
- Tyco control panels and valves
- Addressable detectors and manual call points
- Hydraulic calculation and system design tools
- Fire-resistant cables and termination accessories
The project included the installation of a FM200 clean-agent suppression system, designed to protect critical rooms and electrical spaces from fire without damaging sensitive equipment. This system was complemented by Tyco firefighting components, known for their reliability and performance in demanding environments.
A fully addressable Apollo fire alarm system was implemented, incorporating smoke and heat detectors, manual call points, and sounder beacons connected through fire-resistant cables to ensure continuous operation during emergencies. The fire alarm and suppression systems were engineered and validated through precise hydraulic calculations to guarantee effective coverage and response times.
Our work on this project demonstrated our ability to integrate mechanical, electrical, and control systems into a seamless fire protection network, delivering a reliable and efficient safety solution that meets both local and international fire protection standards.